To: Craig Martin From: Jeffrey Epst Sent Sat 4/28/2012 6:32:19 PM Subject Re: Fwd: no„ they are to be fired, have her send you the necessary paperwork. On Sat, Apr 28, 2012 at 12:31 PM, Craig Martin wrote: He sent me the list this morning. It's obviously a lot of equipment. 8 vehicles to move people, 3 tractors etc. I'll see if i can value engineer/cut list with him. Some equipment may be rented when needed. With that said reducing a few fewer pieces would not reduce the size/price of the building that much. To do that we would need to get rid of more equipment. If we keep everything the building would be good to keep it in and out of sight. You just have to be OK with the $250,000 price tag. Alternatively we would have to reduce the number of pieces of equipment further, park some in engineering (current building by dock) , park some in current shed and some outside. Also; there is push back on discharging Manuel and the two other guys. Miliv ants "Just cause" so she can fill out the paper work. I suggested she just lay off with one else so it looks cleaner to Labor Dept. What arc your thoughts? Crag From: Jeffrey Epstein <ieevacation mail.com> To: Craig Martin • Sent: Saturday, Apri , Subject: Fwd: F rw r message From Date: at, pr , 2 at 10:32 AM Subject: Re: T • ' < [email protected]> , TOM MELNICK attached proposed equipment list and storage location list i will bring revised layout to the table at Ipm today to show how this will work i,m basing this on a larger shed 40 x 100 and extenision to existing shed. considering two phase development of this area. see you at I EFTA_R1_00299838 EFTA01884804