To: Craig Marti From: Jeffrey Epstein Sent Thur 5/10/2012 10:44:58 PM Subject: Re: Pricing on Engineering Building Pad Im sorry„ did i get an answer to what bill brian and john have been doing. On Thu, May 10, 2012 at 5:45 PM, Craig Martin wrote: We had discussed trying to get the building permitted. In the future if you want to erect the building we would need a stamped pad plan by govt. We can skip that if you want. Tom had said there are drafting services in STT that could draw a simple plan. The labor figure is using Tom's construction crew, plus a few more workers that they need on the days they pour cement. I will get Tom to give a breakdown. Craig From: Jeffrey Epstein <.eevacation marl com> To: Craig Martin Cc: Richard Kahn Sent: Thursday, May 10, 2012 4:06 PM Subject: Re: Pricing on Engineering Building Pad what does site drawings mean . who is doing. this makes no sense, who is doing earthwork and for how long. i want now to see details , rich follow up On Thu, May 10, 2012 at 3:55 PM, Craig Martin Here is the quote on the engineering building pad. This is for the pad only. Please see exceptions below. wrote: This pad is designed to hold a future building. Bolts for building, minor drainage is included. If only a pad is needed without provisions for a building the price could be reduced slightly. Craig New Engineering Building Pad Temp Material Outside Vendor Labor Shipping Trucking Tax 200 200 EFTA_R1_00299183 EFTA01884424