To: Jeffrey Epstein 'eevacation mail.com Cc: Emad Hann Rich Kah From: Gary Kemey Sent: Sat 7/30/2011 2:19:11 PM Subject: sub checks Rich was out of the office Fri. For him to sign off on manual checks I believe I need to present to you the contract commitments for approval 1.flagpole coral pavers $4.75 ft.low bid contracted to Saint Tile $18,000 total need check for $6.000 for work in place and they will finish next week 2.main compound stone veneer $25 unpointed,$35 pointed work contracted to Tyson total estimate building and walls 579,000 need check for $21,475 for work in place. 3.flagpole cabana marble and coral $5.25 ft. low bid contracted to Ramon Tejeda, total $9,628 just started no check yet 4. the contractor that did the collumn wall is working the sea wall is also doing the upper patio which is pointed stone both for $28 ft.,total all work $60,000 I will need to continue to need manual checks,just gave him If these contracts are all ok I will request manual check athority Monday from Rich. Approved? NOTE: our inhouse stone masons have laid 988 sq.ft. at the flagpole (measured by the same proceedures as we use for subs)and we have $28,331 posted to job cost which results in $28.67 this # does have some costs of cutting drains thru the existing walls so actuals for just the walls would be some lower NOTE: heli.pad wall made of plastered Er block 5' high $16,180 EFTA_R1_00261339 EFTA01861076