home

epstein-data
Research ▼
🔍 SearchFull-text document search 🤖 Ask AIAI research assistant 🔎 Evidence MapFBI serial resolution 📷 Reverse Image SearchCLIP + face across 614K images 🧑 Find Face BETASearch 29K faces by photo 💻 Run Your OwnDownload & search locally
Explore ▼
📚 Full Text Corpus1.39M docs, 2.77M pages 🌎 Global Heatmap145 countries mentioned 📈 Coverage MapWhat's here 🌌 AtlasSemantic map · 1.29M docs ⚖ Cases53 federal & state cases · per-case briefings 🎤 DepositionsTranscribed audio & video 💬 Hear from the SurvivorsSurvivors in their own words 📖 Cover to Cover-Up24-hour public reading, synced to the video ✉ Wolff–Epstein Emails2,009 messages · 2009–2019
📷 Images92K analyzed photographs 🔍 Multi-DB SearchSearch all databases individually 🗃 All Databases14 searchable databases
Reports
News ▼
📰 NewsCoverage & reporting ⚖ Justice MonitorArrests, charges, lawsuits, firings
Source ▼
🏛 DOJ ProductionOfficial EFTA disclosures 📜 EFTA Law TextPublic Law 119-38 📁 Source Data (GitHub)Open source databases
🌐 Community ResourcesCurated external projects ✉ ContactGeneral · privacy · DMCA · press
❤️ Donate 🎧 Podcast

Research

🔍 Search Documents 🤖 Ask AI 🔎 Evidence Map 📷 Reverse Image Search 🧑 Find Face BETA 💻 Run Your Own Investigator

Explore

📚 Full Text Corpus 🌎 Global Heatmap 📈 Coverage Map 🌌 Atlas ⚖ Cases 🎤 Depositions 💬 Hear from the Survivors 📖 Cover to Cover-Up ✉ Wolff–Epstein Emails 📷 Images 🔍 Multi-DB Search 🗃 All Databases

Reports

Browse All Reports 📰 News ⚖ Justice Monitor

Source

🏛 DOJ Production 📜 EFTA Law 📁 Source Data (GitHub) 🌐 Community Resources ✉ Contact
🎧 Podcast & Newsletter ❤️ Donate Privacy Policy

EFTA01827963

← Prev Next →
Loading document…

To: Doug Schoettle From: Jeffrey Epstein Sent Tue 6/9/2009 9:52:02 PM Subject: Re: Bedroom pavilion repair fine get it done.. it makes no sense that we demolish things before a plan is ready.. doug„ can you give me an approzimate bathorrm schedule On Tue, Jun 9, 2009 at 5:10 PM, Doug Schoettle a wrote: Hello Jeffrey, The bedroom pavilion #2 was in the worst repair and the finishes and electrical system was disconnected and opened up for examination, the roof gutters were also opened up. The leaking gutters have been patched for a temporary fix before the roof and gutters are replaced for the long term. The electrical system of switches and out lets still needs to be replaced as required (due to age,rot and leaks) and then the holes in the wall replastered. All the electrical parts are on the island as part of a large order of parts needed for the island. Lance first removed the furniture and finishes in November 2008 and the electrical parts were ordered, Gary the island electrician should be assigned to the bedroom as soon as possible. The loose and chipped white floor tiles were removed and have not be replaced. A sample board of tiles, the white is the only good choice, has been at the house in Palm Beach since January, I think you have seen it. Inexpensive white tiles may be a good temporary fix until the additions to the house arc made when the floors may all be changed. Regards, Doug EFTA_R1_00203289 EFTA01827963

Suggest a category
Misclassified? Pick a better fit.
Community Notes
▸ People Mentioned
▸ Interest Level
Routine Notable Significant
▸ Dates Mentioned
▸ Related Topics
▸ Places & Organizations
▸ Transcription Correction
Related documents
Source Data Investigation Reports DOJ EFTA CC BY-NC-SA 4.0 Contact
Independent research project. Not affiliated with the U.S. Department of Justice, FBI, any government agency, or Anthropic. All analytical text on this site is AI-generated (Claude, Anthropic) and iteratively fact-checked against source documents, but may contain errors. Verify all claims against linked EFTA sources before citing.
Powered by Datasette  ·  ❤️ Buy me a coffee

You are leaving epstein-data.com

You are being redirected to an external website not operated by this project. We are not responsible for the content or privacy practices of external sites.

Powered by Datasette