From: Warwick Wicksman Sent: Thursday, December 9, 2010 4:24 PM To: Jeffrey Epstein Cc: Gary Kerney Subject: RE: Jeffrey, I will get you an updated schedule for progress deliverables.<=:p> You left me a voice message with some additional pool comments= Do these apply to the Main Residence Pool, or the Flagpole Pool, or=both: •&nbs=; Raise elevation of pool above the ground, so it is up 6&=8221; to 1', so you can sit on the edge of the pool. We =ypically need 4'-5' of deck around the pool. We can raise the deck at the Flagpole Pool, so you can sit=on the edge, facing away. I am not sure if you wanted this at the Ma=n Residence pool, but since the pool is enclosed, I am not sure that it ma=es sense. •&nbs=; Continuous gutter coping. Is that your preference?<=o:p> -84ribs=; Lights over deck only for access. (Ok for Main Residence= Would not apply to Flagpole pool.) Thanks, Warwick =nbsp; =nbsp; &nb=p; =nbsp; Warwick Wicksman, AIA Principal 310.449.5790 =nbsp; &nb=p; =nbsp; Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA Click here to view Gensler's 2010 Annual Report. <http://www.gensler.com/uploads/documents/AR_2010_10=22_2010.pdf> =o:p> EFTA_R1_00110940 EFTA01787508