From: Cecile de Jongh < Sent: Tuesday, September 1, 2015 7:46 PM To: JEE; Rich Kahn Subject: Work in the Office Attachments: IMG_3870.1PG; Untitled attachment 00584.txt; IMG_3867JPG; Untitled attachment 00587.txt; IMG_3866JPG; Untitled attachment 00590.txt The dry wall and ceiling have been installed in our offices. Tomorrow they w=ll sand in preparation for painting. The estimate did not include painting=and I asked the contractor to give us a quote to paint both offices. The new AC unit which sits above the kitchen (see first picture) is larger t=an the last one and therefore sits 2" lower. Because of this, we have to p=t in a new, lower ceiling in the kitchen which will not line up with the ce=ling in the hallway. An arch had to be added to square off the kitchen so t=at the lower ceiling tiles can be installed. This was not part of the quot= either so I'm getting an estimate for that as well. 1 EFTA_R1_00102645 EFTA01782677