From: Gary Kerney > Sent: Tuesday, Sept To: Jeffrey Epstein Subject: Re: Re: That includes the wall on the east end and the two collumns Sent from my iPhone On Sep 20, 2011, at 6:19 PM, Jeffrey Epstein <[email protected] <mailto:[email protected]» wrote: the motor court cannot be 25k as we laid out, On Tue Se 20 2011 at 4:57 PM Ga Kerne «mailto: wrote: Jeffrey over the next 30 days we have 3 subs listed below doing the work below on a cash basis.' need your authorization to have them continue working and me give them local checks. Rodney Rusphille did the collum wall and sea wall. currently has a invoice in for $34,368.04 for the main terrace wall that needs a check to pay his men and show back up. I have him scheduled to do the balance of the motor court wall we laid out and should start tomorrow.will be about $25,000 two draws and we're done with motor court walls Gassie Corner Stone ( Tyson) he is doing the stone veneer on cottage 4 and the little bath,this was budgeted work that I explained the varience and the extra in my sept.l2th email he will bill another $38,000 in two or three draws over three weeks,and we're done Saint Tile they did the flag pole coral deck.He is starting the big terrace tomorrow and then the pool deck $25,000 total ,he'll make two or three draws done in about three weeks when you were here we talked about Brices cottage cabinets and their being over but other line items being under and I was to proceed Authorized for the above? EFTA_R1_00089451 EFTA01775479