From: Brice Gordon Sent: Thursday, July 17, 2014 3:49 AM To: Jeffrey Epstein Cc: John Christensen Subject: ZDC-MH Distribution Pumps Jeffrey Update MH Distributi=n Pumps The Motor on Pump One is grounding out, causin= both control and pump issues. This was probably caused by water=from pressure valve failure. The PLC ( control module) appears to be OK at this time JCH =ave removed motor and will determine if the motor can be repaired. Estimated Lead time for new motor 2 to 3 weeks We do have a sp.re motor, but require new pump gaskets, JCH have ordered gaskets and are s=heduled to repair by Monday next week at the latest. When spare motor and gaskets are installed, system should be fully ope=ational JCH will forward their recommendati=ns for a new pump skid and controls. any concerns=please let know regards =b>Brice Gordon 1 EFTA_R1_00050513 EFTA01752054