From: Brice Gordo Sent: Monday, November 28, 2016 6:59:26 PM Subject: Re: To: "jeffrey E." leevacation©gmail.com> Initially he said he could, but after review of equipment Al is not sure it will work I have attached a list from Jermaine regarding issues etc- these will be added to Punch list If you are OK with Al coining down - I propose we create a list of items that need to be address, and equipment that may need to be replaced so AL has a clear scope of work Shall we proceed with creating a scope of work for Al for your review? regards Brice attached Begin forwarded message: From: "Jermaine" Subject: My suggestions on areas t tat need addressing Date: November 21 2016 at 4:54:19 PM EST To: "Rich Kahn" Good day Rich As per our previous conversation the following is a list of items I feel may need addressing (these are only items that I would like to addressing in the near future): I. Main Compound a. New wiring for Cabana 2 i. The existing corrodes quicker in this cabana than the others. b. Ncw Speaker wires for Chillax Room Audio System i. The system does not sound nothing like the flagpole pool. I would like to boost it a bit to at least equal the tiki hut audio system. c. Google wifi is going to be ready in December. i. Need to find a valid test area. (Possible install on GS.I vs ILS3) 2. Flagpole Pool a. Changing the exterior speaker wires. i. The exterior wires are corroding although I been treating the connectors to slow it down 3. Wood Shop a. Move the wood shop switch next door to captain's office EFTA_R1_00034460 EFTA01743265