Loading document…
Sent: Thursday, November 3 2011 2:28:12 PM From: "Annabelle Neilson" Subject: annabelle To: Jeffrey Epstein <[email protected]> To get up the mountain: One can use a rolling gantry that would be pulled along by a tractor and winch set-up for correct weight capacity. The sculpture could be positioned and then lowered to the base. Roll the gantry away. All the equipment could be rented. For base: Cubic yardage or meters of cement is how base material quantity is measured. lcubic ft is roughly 100 lbs. Concrete load bearing is 2500-5000 lbs per square inch. Hope this helps big kiss honey, love the A EFTA_R1_00030344 EFTA01740794
Suggest a category
Misclassified? Pick a better fit.