From: Brice Gordon To: Jeffrey Epstein <[email protected]> Subject: Heating coil inspection Date: Wed, 05 Jun 2013 13:41:47 +0000 Attachments: Est_for_coil_evaluation_6-3-13.xlsx; photo_1.JPG; photo_3.JPG Jeffrey attached photo's of the #3 heating coil that services the living room gallery/hallway, Main house and an estimate to inspect remaining coils from JBH, cost $1214.91 Estimate includes inspection (one man) and log/report with pictures The #3 coil developed a split a couple weeks ago, flooding the number one basement, fortunately minor damage to unit occurred JBH inspected and it appears at some point the coil has frozen weakening the copper pipe, which after time split. The damage was probably sustained when the property lost power for over a week during the winter 2010/2011 The main living room unit, which is adjacent to #3 also show signs of freeze damage, this coil has been isolated please note these coils are under pressure and if one should burst during the night, damage could be substantial can we proceed Brice Gordon 49 Zorro Ranch Rd Stanley, NM 87056 Ph: EFTA01188983