From: To: Cc: Subject: Date: Attachments: brice gordon Jeffrey Epstein <[email protected]> LSJ Re: Fri, 06 Apr 2012 22:52:47 +0000 Metal_Shed06042012_00000.jpg; Metal_Shed06042012_0000 Ljpg; Metal_Shed06042012_00002.jpg; Metal_Shed06042012_00003.jpg; Metal Shed06042012_00004.jpg; Metal_Shed06042012_00005.jpg; Metal Shed06042012_00006.jpg; Metal_Shed06042012_00007.jpg; Metal Shed06042012_00008.jpg; Metal_Shed06042012_00009.jpg as request, proposed metal shed drawings, these have not been finalized yet. Tom and I will be meeting with ABC on Tuesday to go over drawing and erection schedule etc Awaiting proposal for Roll up doors, and 2 double man doors which will go on the end of the building. These are not shown in drawing I would recommend that we just lay a thick layer of gravel around Engineering area due to the fact that Track Equipment will be stored and maintained there. Library, unit was installed Thursday, will be checking humidity levels tomorrow. Sarah's Office Temperature, both the outlet and return ducts in the bathroom and kitchen do not have in line dampers, which allows to much cool air to these spaces. Design fault. Have restricted air flow to these spaces, by placing a piece of cardboard in ducting seemed to be maintaining temp at this time. Will have ARS put together proposal for in line dampers controlled by thermostat in Sarah office Will show Tom site for generator for Five Palms, we should be able to run copper, switch gear etc in house. Will speak with Danny Vicars about material costs Tuesday Will forward Gliddens review for alternative route from Flag Pool Santa Fe I expect to have the following proposal by the end of the week, Stucco, Phone, Internet Upgrade, Landscaping, Terraces, Working on Well drilling bids, Plan to meet with Casey Cook & Frank Bond when on sight to discuss water distribution/usage vs permit conditions I have Contacted an Agency regarding search couple for the Ranch and a Chef, so I m