SCOTT GFtAF 6501 Red Hook Plaza, Suite 201 St. Thomas, USVI 00802 March 14, 2012 TO: Little St. James ATTN: Rri RE: Irrigation system proposal GE project) TIME: S 3500 - $4000 A total for proposal with me and two helpers at $500 per day for 7 -8 days. My two helpers and I will need to trench and install approximately 200' of PVC pipe, fittings etc. to extend the existing two zones that were installed in October/November of 2011. We will also install turf rotor heads to get sufficient water coverage from the existing grass area below the kitchen/pool area to the palm located on St John hillside of slope. We will need to trench and bury approximately 600' of 1 1/2 ", 1", 34" PVC pipe to pressure fittings to get pressure from the control valves to the perimeter of the slope. We will wire the new rotor zones to the existing controller located under the kitchen crawl space. Estimate total of labor to complete this project shown above. MATERIALS: We located the PVC pressure fittings and PVC pipe to install this project on 3/14/12. We also have the rotor heads and hardware located in the storage area. EFTA01174716