From: Warwick Wicksman < To: Gary Kerney <I Tom Sze <I CC: Jeffrey Epstein <jeevaeation(ii:gmail.com>•, William Rowles >, Subject: RE: flagpole pool Date: Wed, 23 Feb 2011 01:13:09 +0000 Attachments: 22-11.pdf Gary, I got the sketches you sent, and attached is an updated plan sketch based on the new comments. But I am confused about what you are asking us to provide. Our proposal was for conceptual design. It sounds like you are jumping from that to permit drawings in one week. Is that what you now need? And who is engineering the building, including the slab and foundations? Thanks, Warwick Warwick Wicksman, AIA Principal 310.449.5790 Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA Click here to view Gensler's 2010 Annual Report. From: Gary Kerney [mailto: Sent: Saturday, February 19, 2011 7:09 AM To: Warwick Wicksman; Tom Sze Cc: Jeffrey Epstein; William Rowles; Subject: flagpole pool Wawick Specifications for construction development drawings.l need a quick turn around ,can form slab next week. Revised bath and kitchen programs attached Revised site plan attached BUILDING block structure 10' ceiling plaster finish in and out truss roof insulated and corr.metal roofing same as main compound crown molding and copper gutter same as main compound roll down hurricane shutters on 8' sliding glass doors(jeffrey mirrored?) mechinacial awnning over sliding door all other doors slabs EFTA01157466