MALLORY LANDSCAPE AND DESIGN 40 Calle Cristiano Santa Fe, NM 87508 Phone Fax 505-9884443 PROPOSAL FOR ZORRO RANCH March 27, 2013 DRIVE ENTRY AND PARKING COURT MISCELLANEOUS WORK Remove one ponderosa pine including root ball. Remove 5 grasses, 8 spirea, and 12 mahonia. SOIL REMOVAL Remove 12" of soil in planting beds totaling 389 square feet. Disburse on site. NEW TOPSOIL Install a total of 10 yards of topsoil in planting beds where soil was removed. The topsoil will be harvested from the ranch and delivered in close proximity to the planting beds. Eight inches of soil will be installed in each area. SOIL PREPARATION Prepare planting beds measuring 389 square feet to a depth of 12" with the addition of 2" of Back to Earth mulch or similar and 2" of perlite. A mixture of Yum-Yum mix and Planters II trace minerals will be mixed into the soil. The fertilizer will be added at a rate of 20 pounds per 100 square feet of planting bed. PLANT MATERIAL Install the following plant material : 10 Dark Night spirea, 7 mahonia, 3 four foot tall viburnum, 3 Broadmoor juniper, 9 miscanthus grass, 20 mahonia compacta, 2 eight foot tall pinons, and one 12-15' tall ponderosa pine. DRIP IRRIGATION Install drip irrigation to all newly installed plant material. The existing drip zone in this area will be utilized. PECAN SHELL MUCLH Install pecan shell mulch in all planting beds measuring 1080 square feet. COST BREAKDOWN Miscellaneous Work $ 455 Soil Removal $ 350 New Topsoil $ 350 Soil Preparation $ 1,460 Plant Material $ 7,310 Drip Irrigation $ 185 Pecan Shell Mulch $ 1.080 AREA TOTAL $11,190 EFTA01111548