TSG -mow MAKING EVERY DROP COUNT www.tsgwater.com Little St. James Service Report: Feb. 24th. 2014 US. Virgin Islands Operations 6501 Red Hook Plaza, Suite 201 St. Thomas, Virgin Islands 00802-1306 February 18'h, 2014 we started the contracted work at Little St. James Island (LSJ) of replacing the entire contents of the SWRO high voltage control panel that had received severe damage following an incident that sprayed high pressure seawater throughout the panel. Upon entering the SWRO plant Tuesday 2/18/2014 there had been another pipe burst incident and seawater was all over the floor and on the skid of new replacement parts had been sprayed with seawater too. There were several burst tubing connections due to the SWRO plant being operated manually and allowed to run at 980psi. We checked the contents of the new parts and it was determined that the parts inside the wet cartons were not damaged by this latest incident, so we moved forward with replacing the components of the damaged control panel. Below are photos of the parts removed from the damaged control panel. NOTE: ALL components inside the panel were replaced. Georgia • Florida • US Virgin Islands • British Virgin Islands • Anguilla • Turks and Caicos • Bahamas EFTA01109916