Punch List — per JE directives as of February 5.2012 1. Rug -rug for flag pole is due to ship from Guatemala to NY by early next week. It will be flying, so should arrive NY by week's end at the latest. They will have to inspect it, then will have it delivered to Tropical in New Jersey 2. Flagpole bath and cabana — plastic door pushes ordered. Slipcovers for sofa and cushions in production Stereo cabinets estimate due this week — Flagpole lights? Walkway gates latches to be installed, self closers 3. Info Center — looking into remote that can control all 5 fans - Dock Box — pending available time 4. Five Palms — stucco, window, hardscape, electrical 5. Grotto — lookout built with metal roof, landings 6 .Greenheart wood — steps to Grotto - steps top and bottom 7. Heli wall 8. Heli garage. 9. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it — containment for ISO fuel tank — bathroom and room divider — subcontractor 10. Steel shed have estimate for building, budget to be forwarded 31 Jan - shed quote 11. Triangle, commenced work - triangle road 12. Entry tree lights, confirmed ground lighting 13. Pebble beach - Solar fridge, light, fan for pebble beach. 14. Library Dehumidification 2nd unit ordered, Sarah office damper needs new board, invoicing issue still need to sorted out — Sarah's office is to be set at 79 degrees 15. Yellow flowering Alamandra up Old Mill wall and Flagpole hill Peter to train vines to wall 16. Solutions for generators —drawings complete for bid package 17. Fire system — need to review operational and maintenance schedule 18. Top of hill — CLEAN UP - place garbage in circle — build up 10 feet — new helipad 19. Pool — heaters relocation work started, flag pool started 20. Library windows done - shutter in library 21. Five Palms - Floor - Doors location and fabrication -Lighting schedule 22. Tree transplants — Peter redo the three new trees? 23. Guestroom - Cabana 3 leaks, Cabana 1 le