9 East 71st To List updated 05/30/12 6th floor & Roof ■ Kitchen replaces aerator on sink faucet. RB, will repair work completed ■ Movie room — Sony projector not operational need theater /audio company to check to see if it can be repaired. New proposal 5/24 sent to Rich Kahn for. JE to approve. ■ Movie room — middle black out shade not getting proper signal from crestron system needs to be checked. New proposal 5/24/12. ■ JE desk computer speaker wires are they acceptable? Glass table for printer is this good or do we need to order proper printer table. JE decision. ■ Purchase new patio furniture for terrace? JE decision. ■ Terrace — purchase plants spring flowers. Done 4/11 ■ Pressure wash limestone above terrace and terrace pavers RB will do , Work completed.3/27 ■ Skylight all glass old and discolored needs to be replaced caulking needs to be changed. RB will provide proposal to get cost for glass change out 5/4 s pressure washed looks better. Contractor scheduled to come in to see sky light for proposal 5/31 ■ All roof pavers need to be pressure washed. RB will do in May. Work in progress 5/4 will complete 5/14 or 5/15 Work Completed 5/18. Pressure washed cooling tower fan enclosure before cooling season. 5/18 Work Completed. 5th Floor — • Hallway needs to be repainted wood trim and doors patched and painted, clean paint off hardware. RB to provide proposal for JE approval. ■ Clean out and organize lift closet next to Sarah's office RB Work completed. ■ Purchase window shades for rear bedrooms bathrooms and Sarah's, bathroom .JE approved girls need to purchase, SK or SH. 4'" Floor — • Yoga room— new speakers, Cardio equipment make room more useable for JE and guests .JE decision how to proceed with room. ■ Yoga room — purchase lighting or change lighting to over head lighting. JE decision how to proceed. ■ Replace light fixture over stone head in bathroom dressing area. RB will install week of 3/28 or 3/29 Work co