From: "jeffrey E." <[email protected]> To: BMG < >, Richard Kahn Subject: Re: LSJ: RO Plant HP Replacement Date: Thu, 26 Jan 2017 10:02:55 +0000 No choice but rich needs to be involved On Thu, Jan 26, 2017 at 5:02 AM jeffrey E. <[email protected]> wrote: Forwarded message From: Date: Wed, Jan 25, 2017 at 10:39 PM Subject: LSJ: RO Plant HP Replacement To: Jeffrey Epstein <[email protected]> Cc: Rich Kahn >, LSJ GSJ Good Evening In 2015 TSG recommended the replacement of the High Pressure (HP) Pump on the LSJ RO Plant. Noting after Repeater for Profibus was installed we were unable to access plant remotely.!!! This was resolved by, by-passing TSG Login Protocol. Since then we have been able to observe the Plant Remotely in Automatic Operation. This has shown that the HP Pump Operational Oil Temp is Very High - Indicating Salt Water has probably got to the bearings and crank on the Pump Operational Pressures of the Front End of the Membranes is Close to Critical 931psi, Normal 800 psi The condition of the Pump is effecting the ability to meet Consistent Water Quality. Long story short the Pump needs to be replaced, lead time 8 to 10 weeks TSG Proposal Replacement with New Pump - $77,300.00 TSG Proposal to Refurbish Existing Pump - $67,000.00 (estimated) TSG also recommending the replacement of 3 Control Panels @ $34,450.00, I still need to confirm this is required. Requesting approval to move forward with replacement of a New HP Pump and PLC for RO Plant Can we proceed? 340 201 1044 please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE EFTA01055889