From: "Jeffrey E." <[email protected]> To: Eric Roth < >, lvjet Subject: Re: Sunday morning Date: Thu, 27 Apr 2017 13:06:52 +0000 Inline-Images: image007.jpg; image008.jpg; image009.jpg i am in caribean flying back monday, my scheudle for middle east is the issue. not paint slot or contract. . I am in no rush with paint or completion. my travel schedule is priority, I canceld paint slot. I have plenty of time to get it right. also looking at BBJ to add. . if in first round we only do seats and carpet , how quick can i have my plane flying? On Thu, Apr 27, 2017 at 9:02 AM, Eric Roth < Today: Thursday the 27th Input: Monday the 15th (about 2 weeks) > wrote: Needed to get from point A to point B: 1. Signed contract 2. Materials selected (including ordering long lead time items such as the wood veneer — 2 plus weeks to manufacture) 3. Define "open areas" (Aft lavatory walls, potty seat, vanity, UH galley, etc.) Items to put us on track for a successful refurbishment When do you envision signing the contract? (Today would be a pretty good day to do so) Let's meet at your place Sunday momingks early as you want) and review materials that Eileen has put together for you and go over the "open areas" that need definition "If' you are interested in doing paint during the refurbishment, let's review paint colors (I will bring with me) and let's lock in the May 26th paint slot. By doing this we will be prepared for you at input. If you are feeling pressured to make decisions, don't worry because you still have some time on most of the materials if you want to think about them for a little more time, but we can order the wood and start design and structural engineering. By locking in the paint slot you will still have adequate time to select the exterior colors. Your thoughts? EFTA01048057