From: "Jeffrey E." <jeevacationggmail.com> To: Eric Roth < Subject: Re: Preliminary for review Date: Wed, 21 Jun 2017 23:24:07 +0000 Inline-Images: image002.jpg; image003.jpg; image001.jpg hand rails in fabric not ultraleather . price issues to be discussed with rich and tarry, On Wed, Jun 21, 2017 at 5:49 PM, Eric Roth < > wrote: Jeffrey. As per our discussion a few minutes ago. I did not include the work TBD on the pocket door for the cabin side. CHANGE ORDER ITEMS REQUESTED 316 Fwd Lavatory Door $ 870 Design and fabricate a wood veneer overlay cover for the vacant / occupied sign to make it aesthetically blend in with the interior and not make it so conspicuously obvious. The cover will have one (1) hole that will display either color green (for vacant) or red (for occupied) and a thin horizontal slot for the lock override pin. 317 Fwd Crew Galley $ 15,780 Remove the existing hot water container and associated wiring. Modify the space to accept a customer supplied carry on small coffee maker (loose equipment). Relocate existing drawer if possible. All interior surfaces to be painted to match existing. Install new 110v 60Hz provisional outlet and associated wiring. 404 Hand Rails $ 4,820 Unfasten the cabin area PSU I valence assemblies to gain access to the wood veneered hand rails. Remove the hand rails from the PSU assemblies. Prep and cover the hand rails in the same ultraleather material as the PSU's to match. Reinstall newly covered hand rails and EFTA01042984