From: Stephanie Remington To: J <'eevacation4 mail.com>, Richard Kahn < , Daphne Wallace , Patrick Cena , michael glidden Subject: Progress Report _ 031819_032419 Date: Mon, 25 Mar 2019 14:01:15 +0000 Please note: This is a summary of the last week's focus, not a comprehension of all projects. Carpentry. JE approved lattice paneling from carpenter samples. Now building to spec for tiki kitchen. Removed all rusty hinges from MC interior kitchen shutters and replaced after treated and painted as replacements could not be found locally. Opened cistern hatch. Assisted with putting master back together after floors. Built secure tool storage cabinet for wood shop. Replaced FPP latches on both gates. Electrical/Plumbing. Completed install of both dishwashers. Timers here installed. Ordering more. All lighting in LSJ installed. Bulbs ordered. Replaced all recess ceiling lights around MC veranda. Completed the electrical and plumbing and gas tie at LSJ tiki kitchen. Engineering. Swap out bucket for hammer and then back on big excavator. Received new cement mixer and commissioned it for use. Finished commissioning the John Deer. Waiting for hitch that will hopefully arrive this week. Rust remediation on light towers. Cleaned equipment and buggies. Buggy repairs and maintenance. Parts arrived for bikes, so working on those now. Heavy Equipment. Dug deep corner footing for MC flowerbed. Did seawater intake well at GSJ. Completed site work for container structure at Christmas Cove. Cleaned seaweed off beach at GSJ (ongoing battle with seaweed has begun). Graded all roads on LSJ and cleaned beaches. Assist with moving BOLs. Completed septic install on GSJ for main compound. Housekeeping. Put master and kitchen back together. Usual rounds. Landscaping/Masonry. Assisted with completion of install of GSJ main compound septic. Began pebble beach stonework. Received large order from ABC. Will be working those in coming week. Boschulte was here Saturday 3/2