From: Stephanie Remington To: J --, Richard Kahn < , Daphne Wallace , michael glidden Patrick Cena Subject: Progress Report 02/18/19 - 02/24/19 Date: Mon, 25 Feb 2019 10:08:06 +0000 Please note: This is a summary of the last two weeks' focus, not a comprehension of all projects. Carpentry. Completed chillax soffit. Framed and hung master exterior mirrors. Fix gate at heli. GSJ tiki continued. Demoed lattice — LSJ tiki. Electrical/Plumbing. Reinstating 3 lights damaged in storm by stone tower. Continue landscape lighting maintenance and repair. Broke down toilets, sinks — Cabanas - prep for Absolute Flooring. Installed lighting in new soffit in chillax bath. Replaced exterior outlets and switch plates. Power for sander — needed 220V. Check GFI - electric car. Fix edger for floor guys. Engineering. Piston on lull. Disconnect hammer for trackhoe for slab. Quad ski - change belt. Dump truck - removed old cables. Assist w barge repairs. Clean all heavy equipment. Pressure wash carts, Assess parts needed for Polaris. Clean. Heavy Equipment. Assisted Landscaping — moving Palms to New Beach. Assisted Boschulte — reinstating boat ramp — LSJ. Housekeeping. Helped w extra cleanup in tunnel and at tiki from floor guys in addition to usual rounds. Also assisted w emptying cabanas, FPPool etc for floor guys Landscaping. Helped to pour concrete on pebble beach. Transplant all new palms to new beach. Trim palm trees by library. Install new irrigation line on new beach. Built new stone wall by new flag pole pool road. Began moving plants to flag pole pool area. Fix jasmine on GSJ (sea grape tree planter). Marine. Little C maint. Underway. Barge prop was trimmed, and then picked up debris that had to be removed, then had scheduled repairs. Further issues found in motor and parts ordered. Down at least through Tues. Ferry will continue to be in use for morning runs. Doing two staff runs w two boats in evenings. Painters. Paint frame - ext mirror at Master