From: Richard Kahn < To: Jeffrey Epstein <jcevacation(q.gmail.com> Subject: Fwd: GSJ - MAINTENANCE BUILDING NEW CONCEPT Date: Fri, 01 Mar 2019 21:24:49 +0000 Attachments: GSJ_-_MAINT_FLOOR_PLAN_CONCEPT_2019.02.28.pdf; GSL- MAINT SITE PLAN CONCEPT 2019.02.28.pdf; GSJ_- MAINT SITE SECTION CONCEPT 2019.02.28.pdf; 2019.001.02 GSJ - MAINTENANCE_BLG_PROGRAM 2019.02.23.pdf Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor New York, NY 10022 tel fax cell Begin forwarded message: From: Jeffrey Boschulte < Subject: GSJ - MAINTENANCE BUILDING NEW CONCEPT Date: March 1, 2019 at 3:06:40 PM EST To: Richard Kahn Good day Rich and Michael, , LSJ Michael Glidden < Please see attached for the GSJ Maintenance Building New Conceptual plans. Include are a site plan, site section, and floor plan. This concept divides the building into two rectangles rather than the original "U" shape. This allows for access to the remainder of the peninsula so those three parcels are have access. There is an easement that runs through straight between the two buildings. Also allows for the smaller building to house the work functions separately from the garage/vehicle storage areas. This allows better air quality in the work areas, also will allow you to cut down on A/C and energy usage. Also breaks up the building rather than having one massive building on the top of the hill. One taller building for the vehicles and a shorter building for the work spaces. The floor plan shows a plan grid for the metal building structure and anticipated concrete slab size. No interior walls yet just room names/labels which show the relationships of the various spaces within the exterior walls. The cottage construction documents are 95% complete; we are just doing a final review. Thank you, EFTA01032077