From: J <[email protected]> To: Stephanie Remington • Subject: Re: Progress Report 02/04/19 - 02/17/19) Date: Mon, 18 Feb 2019 17:37:37 +0000 thx Im aware. see you tomonv On Mon, Feb 18, 2019 at 1:28 PM Stephanie Remington cMIMIla wrote: Sir, the person's are Sylvester, Okeam, and Kyle. I haven't released anyone yet. On Mon, Feb 18, 2019 at 1:19 PM J [email protected]> wrote: why not now, it three names? On Mon, Feb 18, 2019 at 1:15 PM Stephanie Remington < wrote: Will cover with you when we met in the morning. On Mon, Feb 18, 2019 at 7:56 AM J <jeevacation®gmail.com> wrote: closing hindges? new carpenter? back terrrrace light. pool door handle? hirings/ pebble beach pour?? . carmix . operator jeffers start date.? . color for concretee? On Mon, Feb 18, 2019 at 4:14 AM Stephanie Remington < Good morning, Sir, wrote: Thank you for this time with my mother. I'll be back to work tomorrow. Do you want to meet with me before you go? Stephanie Remington LSJE, LLC On Sun, 17 Feb 2019 at 17:35, J <[email protected]> wrote: names of people to be released, ALWAYS . . pebbole beach pour"? On Sat, Feb 16, 2019 at 10:04 AM Stephanie Remington alMilla wrote: Please note: This is a summary of the last two weeks' focus, not a comprehension of all projects. Carpentry. Repaired coral stone at chillax bath. Cut in sink, cooktop in temporary countertop at FPP Kitchen. Moved kitchen equipment for tiki floor prep. Assist w Tiki Ceiling — GSJ. Self-closing hinges on doors at MC. Replaced warped pressed wood louver doors by kitchen with new wood doors and reinstalled hardware correctly. Reoriented Grotto roof. Electrical/Plumbing. New landscape lighting along MC pool. Repaired landscape lighting everywhere including main feed where desal trench was dug. Water heater replaced — GSJ. Bulb replacements. Flushed water systems at master bath. Permanent lighting to all dock structures. Moved electrical, vanities, installed sink plumbing to ready c