From: "Jeffrey E." <jeevacation®gmail.com> To: Jermaine Ruan >, Richard Kahn Subject: Re: LSJ/GSJ status Date: Fri, 15 Sep 2017 00:28:22 +0000 Inline-Images: IMG_6897.JPG; IMG_6898.JPG Yes but asap On Thu, Sep 14, 2017 at 7:27 PM Richard Kahn < > wrote: Richard Kahn HBRK Associates Inc. Begin forwarded message: From: Jermaine Ruan Date: September 14, 2017 at 6:45:08 PM EDT To: Kahn Richard Cc: Rodriquez Ann Subject: LSJ/GSJ status Good day Rich LSJ/GSJ is without phone and intemet at the current moment ViYA link via fiber have been destroyed due to the majority pole being snapped along the road to cabrita point. The dragonwave radio are offline the need to be evaluated and realigned I also heard from an out side contractor working with viya that a second tower that feeds the tower that our stt dragonwave are mounted needs to be repairs. I found the storm destroy the radio that help feed data and phone to the lsj tower so that the dragonwave can send it to GSJ was destroyed along with the Cisco 48 port 3560G switch for the GSJ main complex. I have reach out to Earl, Hector, and Alyster and have been assured that as soon as they can make sure their side is stable they will try to restore service. Earl states he will get to us as soon as they can and will schedule us along with ritz and the banks in red hook. In addition, I will see if there are any hotspot at att for the boss visit. May I send a list of items that I need for stc lsj and GSJ tomorrow (I am waiting on specs from Earl of VIYA) Respectfully submitted Jruan EFTA01022094