From: Jeffrey Epstein <jeevacation®gmail.com> To: Daphne Wallace Subject: Re: Cleanup of the Engineering shed bays - July 31, 2012 Date: Wed, 01 Aug 2012 00:12:18 +0000 explain that this should take ten days no more.. paint it white, if they have to cover the floor with cement or epoxy„ On Tue, Jul 31, 2012 at 5:52 PM, Daphne Wallace < > wrote: Greetings Mr. Epstein, I spoke with Danny this afternoon regarding your directive for cleaning up the 5 storage bays in the Engineering shed. Outlined below is his plan, for your review, comments and approval: Bay 1 (new Engineering storage): Build in the shelving Paint the walls and shelves Brian will create a cement cap for the air vent on the back wall Bay 2 (new Painting storage): Complete the shelving Paint the walls and shelves Cement cap for the air vent on the back wall Bay 3 (new Landscaping storage): Build the shelves Paint the walls and shelves Cement cap for the air vent on the back wall Bay 4 (Old engineering office - probably will become additional engineering storage) Build a subwall to hide the old electrical - there must still be an access panel because this electrical is still in use powering the Manager's cottage and Danny will rewire it to also power the Engineering shed - shelving will be built on the subwall The existing shelving to the left will be cleaned up and additional shelving added The Chromix presently stored in this bay will be discarded - it was purchased to complete the main entrance, before the plan was changed to apply the "Devil Mix" gravel instead Bay 5 (Old desal - probably will become additional engineering storage) Danny plans to completely dismantle the old plant Build shelving Paint walls and shelves The floors in all of the bays are currently tiled. In two of the bays the floors were leveled/filled during the wall repair. Danny had no plans to retile the floors. He also plans to rewire all 5 storage bays. Danny presently does not have a timeframe f