From: Leighton Allenby To: "Jeffrey E." <jeevacation®gmail.com> Cc: NYC - Richard Kahn >, Leighton Allenby Subject: Re: Date: Fri, 28 Aug 2015 21:07:32 +0000 Hello Mr. Epstein, Prepping for the storm has consumed my time and the staffs time as well. I cannot control mother nature. Omar came over and looked at job on 21st and despite repeated calls I have not received final pricing. I called him earlier today and now have his square foot price which I will convert to a final number after I look up block cost for large 250' wall which I measured with Chris the other day and its 385' long. I will have this to you this evening. Chris said you wanted this wall two cement blocks wide (running linear by 10' tall, stone faced on the top and driveway side. The block side facing the maintenance buildings would be painted. Is that correct? I have been on the excavator repairing the barge ramp and road access to the driveway to the left of the boat dock as it was washed away form the storm and no staff was on LSJ today - the pricing would have been completed earlier. I have stopped as the barge isn't coming over until Wednesday. Right now no intemet, we just went back on power and the alarms are sounding in the generator panel room and I am dealing with that....Anna spoke with Danny on phone (was told by Anna Danny said this happens all the time and he will reset in the AM). Danny has not returned my text or call. Terrance is working on the internet problem remotely and will come over in the AM if he cannot fix. I will update the timeline to reflect days missed by staff and storm preparation and cleanup by tomorrow am. The barge isn't going to do our runs until Wednesday - they are on one engine I will put on the timeline the # 8 from the update from August 11th meeting - see email below The plans have been reviewed, I am in communication with Buck steel, he was on vacation and We need to price out the concrete work. I am going to do a separate timeline