Construction Proposal Quantum Vision Construction LLC 8168 Crown Bay Marina Suite 505 PMB 260 St. Thomas, VI 00802 September 12, 2018 Owner: LSJE Project: Asphalt Pathways Paving Works Little St. James Island, VI Little St. James Island, VI SCOPE OF WORK: • Prepare and grade existing sub base • Eradicate and remove weeds and organic material from existing sub base. • Compact sub base to insure stability • Spread and compact 3 inches of aggregate base material • Place new 3•inch reinforced Portland cement concrete pathway, mimimum 4=inch pavement is recommended for vehicular and equipment traffic. Concrete will be a minimum 4,000 PSI. SPECIAL CONDITIONS: • LS] will remove, secure, and replace all stone and other border edges. • LS] will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island. • Aggregate base will be supplied by owner. • Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor will not be responsible for replacement of these damaged areas while implementing normal construction procedures. • Amount of $114,000.00 will be credited to owner on behalf of Betteroads Asphalt LLC. OPTION (NOT INCLUDED IN BASE PRICE): • As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re•Surfacing Project" and dated September 18, 2014. TOTAL BASE PRICE: $712,586.00 Little St. James Island Paving Page I of 2 EFTA00807988