6612 10,916 Hours, A/C and Engines MFG 2001, EIS 7/2002 VP-O3B s/n 32806 4823 Cycle/Ldgs A/C and Engines Work Order 1999M Overview of Comlux Work Order and viewing: 2016 major items: Start of work order 12/12/2016 (possibly date of quote?) Al check, A2 check, Cl check, (posted 12/12/2016 as "open" ) Preservation item 10/26/2016 (?) Inspection seems to have started at the end of 2016, with discrepancies being worked until about 4/2017. There was a break in item signoffs after that with numerous small discrepancies accomplished at the time, others not complied with until Nov 2017. From Al inspection- Open or items cleared in 2018- Mostly paint missing and surface corrosion items, all show cleared. From A2 inspection- Open or items cleared in 2018- **Replace water filter- open Accomp A2 check- open *Operational test of PATS fuel control unit- open **Operational check water system- open (*probably delayed for fuel tank replacement) (**probably due to water system items found) Functional test center tank boost pump failed system- cleared 1/8/2018 Func test center tank auto shutoff system- 1/8/2018 Open discrepancies from A2 inspection- Water heater leaking Fwd lay water selector valve broken Airstair support handle rods cracked From 1C inspection- open or items cleared in 2018 Op check forward water drain valve- open Numerous entries for passenger door inspections signed off 1/5/2018 Open discrepancies from 1C inspection- 2 items show open for It/rt horizontal stab leading edge corrosion, but were installed when I was there. RT Horiz stab tip corroded- Corroded band clamps on wing bleed air system (found during slat install?) Added 4/18/2017- "Due to change in MX program comply with added items" 4/18- C/W A3 check 6/28- Hydro/insp- Cargo fire bottle hydro, Aft escape slide O/H, AD horiz stab attach- insp, 6/28- AD to replace horiz trim actuators (terminating action for prior AD) 6/28- accomp weight check of aircraft EFTA00807090