JE - LSJ and GSJ - W/E July 14, 2017 Task Name and Scope Assigned To Dural' on Start Finish Status Comments 1 Cabana 2 New a/c unit install Michael 1d 07/21/17 07/21/17 2 Virgin Mary Je lOAdvise 3 MR paint trim tabs Carlos 1d 07/21/17 07/21/17 complete 4 Christmas cove shelf make level Peter 07/18/17 5 Jim Cross landscaping Report done by 7-24- 17 9d 07112/17 07/24/17 12 volt Fan order for pebble beach shipped Kimberly 6 and due to arrive in Palm Beach Between August 9th and the 20th 7 Back fill hole next to fuel tank room Jules 1d 07121117 07/21/17 Comp to 8 Fix Air pump compressors outside pump room in staff kitchen Michael 07/21/17 9 Fix dogged drain inside pump roomLSJ Danny / smile 07119/17 In Progress 10 Cover all electrical panels, and outlets. Danny V 5d 07/24/17 07/28/17 11 Fuel Tank room needs serviced -- Tank 2 FOS valve Failure and Replace polish filters. Danny V Awaiting Report & Bid. Anna to Mow up with Nester on 7121 Ann Called Nester. awaiting Bid 8 report 12 Hang swing at pergola sylvester 33d 06/15/17 07/31/17 13 Relocate dryer vent at Gsj Danny E 1d 07/21/17 07/21/17 Complete 14 set up scaffolding and 4 flood lights on palm danny V 07/20/17 Jee to approve 15 Fix pavors on pops terrice Dupson 16 Fix tile on pops terrice Svester 17 Rebuild back step and A/C screens at cottage house Lsj Sylvester 6d 07/31/17 08/07/17 18 Build roof and doom at the info center electrical area Sylvester 4d 08/01/17 08/04/17 19 library fix buzzing lights inside. Danny V 06/28/17 Je needs to approve 20. Replace out door recessed lights library Danny V 1d 07/21/17 07/21/17 Complete Run electrical wire to sconces on stone Danny V 1d 07/24/17 07/24/17 21 pillars Master dr. entrance of compound. 221 LSJ Under water lights need to be fixed Danny V 6d 07/11/17 07/18/17 PROJECT COMPLETED 23 Waterfall: Danny to fix waterfall Shut off switch Danny