From: "Doug Schoettle" To: "Emad Hanna" Subject: Re: Date: Fri, 03 Jul 2009 15:48:12 +0000 >, "Jeffrey Epstein" <[email protected]> Dear Jeffrey, The electrical outlets to supply power for future lighting were positioned around the property at the time the large tree lights were installed. Two blanked off outlets were installed at the seawall along the dock for future lighting. Any type of lighting can be connected to these outlets, the simplest might be the same Home Depot small cone light that is used at LSJ and used to be at PB. The statue at the end of the swimming pool and some smaller plantings may also be lighted. (none of the old fixtures at PB were able to be salvaged) Regards, Doug - - On Thu, 7/2/09, Jeffrey Epstein efrevacation@gmailcom> wrote: From: Jeffrey Epstein <[email protected]> Subject: To: "Doug Schoettle" < >, "Emad Hanna" Date: Thursday, July 2, 2009, 12:09 PM were lights for the dock in palm bah ordered,,, if not why not EFTA00772517