From: "robert couturier" To: "Jeffrey Epstein" <[email protected]> Subject: Re: LSJ - revised Drawings Date: Fri, 28 May 2010 14:47:44 +0000 Importance: Normal Because it is not designed yet Sent via BlacicBerry from T-Mobile From: Jeffrey Epstein <[email protected]> Date: Fri, 28 May 2010 10:30:36 -0400 To: Abram Muljana Cc: Gary Kerne Subject: Re: LSJ - revised Drawings the builiding that leads into the pool is undecipherable. On Fri, May 28, 2010 at 10:09 AM, Jeffrey Epstein <jeevacation®gmail.com> wrote: these plans are filled with errors , we have to be better.. terraces going nowhere guest bedroon left off no place to sit ouside of pool, gary and i are concerned that much of what we speak about does not translate onto the drawings On Thu, May 27, 2010 at 2:57 PM, Abram Muljana Shelley: Gary: Enclosed revised & additional drawings: > wrote: • A-001 & A-002 - Site/Construction plan - New location for Projection Room/Cinema; No Terraces (05- 27-10) • A-003 - Living & Pool Facade - No Terraces/Planters by the Pool; Showing Interior Layout Pool & its adjacent structures (05-27-10) • A-003.03 - Detail (size) of Front and Rear Columns in Living/Dining/Kitchen Area (05-27-10) • A-006 - Kitchen - TV location adjusted (05-27-10) All drawings in 36 x 24 format. EFTA00752817