From: "robert couturier" <1 To: "Jeffrey Epstein" leevacation@ ail.com>, "Abram Muljana" < Subject: Re: LSJ - revised Drawings Date: Fri, 28 May 2010 14:47:20 +0000 Importance: Normal Not designed yet this is for pool and projection room locations!! That is all that matters, I took away the terraces and not put anything yet!! Sent via BlackBerry from T-Mobile From: Jeffrey Epstein <[email protected]> Date: Fri, 28 May 2010 10:09:25 -0400 To: Abram Muljana Cc: Gary Kerne Subject: Re: LSJ - revised Drawings r>. these plans are filled with errors , we have to be better.. terraces going nowhere guest bedroon left off no place to sit ouside of pool, gary and i are concerned that much of what we speak about does not translate onto the drawings On Thu, May 27, 2010 at 2:57 PM, Abram Muljana > wrote: Shelley: Gary: Enclosed revised & additional drawings: • A-001 & A-002 - Site/Construction plan - New location for Projection Room/Cinema; No Terraces (05- 27-10) • A-003 - Living & Pool Facade - No Terraces/Planters by the Pool; Showing Interior Layout Pool & its adjacent structures (05-27-10) • A-003.03 - Detail (size) of Front and Rear Columns in Living/Dining/Kitchen Area (05-27-10) • A-006 - Kitchen - TV location adjusted (05-27-10) All drawings in 36 x 24 format. Best, EFTA00752809