From: ion nicola To: Jeffrey Epstein <[email protected]> Subject: cabana no 3 and master bedroom Date: Wed, 01 Dec 2010 01:54:45 +0000 Importance: Normal hi Jeffrey, ..so cabana no 3 and the master bedroom are ready to go. cabana no 3 still needed today a little work so in the meantime i did a little area with venetian plasrter in master bedroom to see how it goes, because the walls are not that flat..but it looks good after a few coats of venetian plaster. i started the samples for the master bedroom vestibule too..the background will be white venetian plaster too. tomorrow i'll start cabana no 3 and i was thinking that we could start master bedroom too. i think would be good if we have one or two more people because if i do by myself the entire area with venetian plaster its going to take forever: usualy i put 3 or 4 coats of venetian plaster, but here we have to put like 4 maybe 5 coats because the walls are not flat.. they are pretty bumpy, then i have to put 2 more coats of wax and then burnishing everything with blade. and there are two small rooms , the vestibule, and the master bedroom means kind of a lot to do. so maybe two people would be even better..besides i might need an asistant for the cabana no 1..it has big walls anyway, this is just a thought for finishing faster the all bedrooms. so, what do you think? thank you, ion EFTA00751762