From: Craig Martin • To: Jeffrey Epstein <[email protected]> Subject: Re: Fwd: Date: Sat, 28 Apr 2012 16:31:47 +0000 He sent me the list this morning. It's obviously a lot of equipment. 8 vehicles to move people, 3 tractors etc. I'll see if i can value engineer/cut list with him. Some equipment may be rented when needed. With that said reducing a few fewer pieces would not reduce the size/price of the building that much. To do that we would need to get rid of more equipment. If we keep everything the building would be good to keep it in and out of sight. You just have to be OK with the $250,000 price tag. Alternatively we would have to reduce the number of pieces of equipment further, park some in engineering (current building by dock) , park some in current shed and some outside. Also; there is push back on discharging Manuel and the two other guys. Karen wants "Just cause" so she can fill out the paper work. I suggested she just lay off with everyone else so it looks cleaner to Labor Dept. What are your thoughts? Crag From: Jeffrey Epstein leevacation©gmail.com> To: Craig Martin Sent: Saturday, ril 28, 2012 11:14 AM Subject: Fwd: From: Date: Sat, Apr 28, 2012 at 10:32 AM Subject: Re: To: jeffrey epstein <[email protected]> Cc: TOM MELNICK j attached proposed equipment list and storage location list i will bring revised layout to the table at 1pm today to show how this will work i,m basing this on a larger shed 40 x 100 and extenision to existing shed. considering two phase development of this area. see you at I On Sat, Apr 28, 2012 at 5:52 AM, jeffrey epstein <jeevacation®gmail.com> wrote: Furniture plan?? Sent from my iPad Little Saint James EFTA00642028