From: Daphne Wallace To: Jeffrey Epstein <[email protected]> Cc: brice gordon cta, Subject: Danny's Report of activities for the last two weeks - August 10, 2012 Date: Fri, 10 Aug 2012 19:00:02 +0000 Greetings Mr. Epstein, Below for your review and comments, Danny has outlined the projects that the staff has been working on for the period 7/30/12 - 8/10/12: 7/30 - 8/03/12 Clement and Benny: fabricated the 5 doors for the Engineering shed bays - this was a time-consuming task because they milled and created the tongue-n-grove - the lumber for this project was recycled lumber that was on site. Gary and TJ - redid the berm's stone threshold, painted the woodshop Sharimo - repaired several of the gators Jules - worked on road compaction, replaced the berm boulders, crane operator for the batch plant removal Brian, Sheridan, Karl - removed the equipment out of the tunnel so the floor could be epoxyed Peter and landscaping crew - replanted half of the sundial where the trees died, tied down the palms for hurricane PreP Lester - captained the boats and barge, assisted with Little C's engine removal and the removal of the batch plant. Guy - renewed a 3" water line, assisted in all of the barge runs, repaired the hoses in the barge bilge. Boscoe, Carlos - on vacation Dulce, Katie, Sandra - household maintenance, secured the shutters on the doors throughout the main compound as part of the hurricane prep Cuthbert (Smiley) - pool maintenance, RO, fuel and electrical readings 8/06 - 8/10/12 Clement and Benny: hung all the doors in the Engineering shed bays, fabricated the shelving, completed the plasterwork around the doorframes. Gary and TJ - painted and caulked all five Engineering shed bays, assisted in the plasterwork around the door frames. Brian - built the Engineering shed outer wall, epoxyed the floors of the Engineering shed, assisted Boscoe with loading the Office trailer on the barge, epoxy, cleaned up the area where the office trail