From: Daphne Wallace To: "Jeffrey E." <jeevacation®gmail.com> Cc: ann rodriquez Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:19:41 +0000 Greetings Sir, John's response to your comment: Right now there is a void, in which a transformer is located. The wall you are referring to on the Page 9 elevation (B-A2.0) is that void. In order to extend over the void the building would become too wide to navigate and provide access to building A (RO building) without substantial earthwork in the area. I am also concerned about having enough maneuverability to take the dump bins in and out if the building is made wider. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:38 PM, jeffity E. <jeevacation®gmail.com> wrote: page 9 elevaion is wrong shoudl extend past teh wall On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < > wrote: Greetings Sic Revisions from John for your review and comments. Respectfully, Daphne Forwarded message From: John P. Woods, AIA Date: Wed, Apr 22, 2015 at 2:03 PM Subject: R.O. & Generator Bld . Revisions To: Daphne Wallace , Cecile de Jongh < rodriquez Daphne, , ann Attached are the revised drawings for the R.O. & Generator Building Roofing project. These changes are based upon comments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exterior sheathing shall be a typical metal siding provided by the steel building manufacturer. The eave height of the building shall be reduced to EFTA00631334