LSJ - Island Punch List/Project list as of 1/3/2013 PRIORITIZE PROJECT DESCRIBT1ON I Laborers I Hours Labor Cost atomic Total Estimated cost Start Date End Date Note MAINTENANCE I. Equipment and Vehicles Brakes Black Bikes 1/3/2013 - reviewed & adjusted 1/3 Excess Oil Disposal - proposal forward to Rich K relowarded to Jeanne 12/29 awaiting direction 3,000.00 I Electric Golf Cart Damage - forwarded photos to dealer 1/1 awaiting response 1 -2. Five Palms Picture Frame (86 x 70) 1/3/2013 1/22/2013 Canvas on site -forwarded to framer 1/3 completion expected 1/22 3. Dock Boxes Fabricated a lighter lid, still to heavy -investigating resin/plastic option, up to 4 ft high win forward 1/5 6. Roads General re-grading of roads-ongoing S. Landscaping- Peter's UN Line all Roads with Rocks - ongoing Removed Palm Tree on MC Hill - replacement JEE to advise Black Hell Under Pads- installation to begin 1/10 existing pads to be removed 1/10/2013 12. Stone Wags Repair work to replace missing loose stones & complete Hell Pad wag - after Employee Bathroom Protect a 20. Storage Areas- All areas to be organized & inventoried 21. AC - Proposing that the 2"r unit from Kitchen is replaced & relocated to a Hobbits Barge Brice to Maintenance contract option request proposal from island Marine Paint window frames Danny Projects Move kghts on flag pole Chilies bathroom electrical Beach Office - repair outside hard Relax Bathroom - rewiring Pool Cabana - change lights parking area Screen Room - repair lamp 5 Pages - repair x 2 floor lamps 5 Palms - review exposed wires around coconut palms berm - cover Electrical box kilo Center - review outside electrical box area 1 of 5 EFTA00598504