Punch List — per JE directives as of December 20, 2011 1. Chillax room — motion detector switch — should only have one light switch — Gary Moses 2. Light upper step near Master bedroom — not working — Gary Moses 4. Light on lady — not working - not on 3. Dock boxes — shock absorbers 4. Remote lights — not on 5. Flagpole pool - Take the pool cleaners out - Scuppers are either rusted or broken — please send photo to Bart 6. Chillax room - red and blue rug to be tried — the pillows may be the source of the smell 7. Banquette — two tree lights near banquette 8. Gym - No remote light switch - No ceiling fan control - IPod input - Battery in remote needs changing - Gutter is leaking in the front Punch List — per JE directives December 2, 2011 1. Gym renovations — budget for JE review and approval 2. Cabana 4 furnishing — DESK 3. Flagpole bath and cabana — refrigerator 24" wide, 23" deep, stainless steel, and door swing on right - Brice ordered - robe hook outside shower -pool pump insulation for domestic fresh water distribution pump on order — walkway gates schedule — Bill 4. Brice cottage 5. Dock house —JE to make decision on square base around columns — size, height, color, finish 6. Electrify info center 7. Five Palms — JE approved height — Tom — two high windows 8. Grotto 9. Heli wall 10. Stereo — punch down pending 11. Color in basket and trees — 12/9 12. Big wind doors — K&S Caribbean has ordered the material — 30 days (11/30) 13. Big wind doors lighting - 2 recessed ceiling lights centered on each side of the doors — set on sconce timer 14. Rip Rap - Library and Engineering road - per JE, Jules on this project Saturdays of November and December 15. St. John terrace — change lights 16. Hangar —floor sanding in progress — 40'X50' area for slab, 3 foot wall around it — containment for ISO fuel tank — bathroom and room divider 17. Plants bought from Italian woman 18. Steel shed for the new workshop area 19. Triangle 20. Dock hou