Punch List — perJE directives as of February 5. 2012 2. Slipcovers for sofa and cushions in production Stereo cabinets estimate due this week — Flagpole lights? w 3. - Dock Box- pending available time 4. Five Palms — stucco, window, hardscape, electrical 5. Grotto — lookout built with metal roof, landings 6 .Greenheart wood — steps to Grotto - steps top and bottom 8. Heli garage. Concrete poor 9. Hangar -floor sanding in progress — 401(50' area for slab, 3 foot wall around it — containment for ISO fuel tank — bathroom and room divider — subcontractor 10. Steel shed have estimate for building, budget to be forwarded 31 Jan - shed quote 11. Triangle, commenced work - triangle road 12. Entry tree lights, confirmed ground lighting xmas lighting 13. Pebble beach - Solar fridge, light, fan for pebble beach. 14. Library Dehumidification 2nd unit ordered, Sarah office damper needs new board, invoicing issue still need to sorted out — Sarah's office is to be set at 79 degrees 15. Yellow flowering Alamandra up Old Mill wall and Flagpole hill Peter to train vines to wall 16. Solutions for generators —drawings complete for bid package 17. Fire system — need to review operational and maintenance schedule 18. Top of hill — CLEAN UP - place garbage in circle — build up 10 feet — new helipad 20. Library windows done - shutter in library 21. Five Palms - Floor - Doors location and fabrication -Lighting schedule 22. Tree transplants — Peter redo the three new trees? 23. Guestroom - Cabana 3 leaks, Cabana 1 leaks Main terrace — sealing of gutters in progress 24. Tiki - Shields due end of the month - Dock box pending available time 25. Sunken garden berm continues 26. Concrete roads at flagpole 27. Concrete triangle 28. Compass - sundial 29. Bench placements - bench on peninsula point — benches, grotto 30. Engineering clean up continues 31. New vehicles 32. Dock Decking - dark stain the dock sample 34. Lighting - adjust landscape lights at nigh