PROPOSAL FOR ZORRO RANCH CENTRAL $5100.00 Seed and irrigation system install of SE corner field (across from office) Material only. Staff to install. $4700.00 Seed and irrigation system install behind hay barn Material only. Staff to install. $320.00 Seed for: Yellow house yard, field across from office, behind hay barn& Along road by fire house. Staff to install. $1500.00 Deck repair to the 2-story red house. Staff to repair $1320.00 Patio & walk way (pavers) in yard of 2-story red house. Staff to install. $1200.00 Concrete walk way to yellow house from road. Staff to install. $4300.00 Window replacement at Bunkhouse. (12)Staff to install. $1400.00 Double door replacement in living room at Bunkhouse. Staff to install $1600.00 Window replacement at Stables. (4) Staff to install. $400.00 Replacement of siding on outside of greenhouse. Staff to install. $4800.00 Re-paint stucco and window trim and doors at Bunkhouse. Contract out $2000.00 Re-paint inside of yellow house. Contract out. $2000.00 Re-paint garage of yellow house. Contract out. $2700.00 Re-paint stucco, fascia & soffit, posts and windows of yellow house. Contract out. $1400.00 Re-paint inside of office. Contract out. $2200.00 Re-paint outside- fascia& soffit, and all windows and doors. Contract out. $2000.00 Re-paint outside of greenhouse. Contract out. $3300.00 RIO Discharge. Install 2000' line away from ranch central into pasture. Staff installs. $100.00 Paint and label road directional markers. Staff EFTA00583312