January 14, 2011 Office Pavilion Outdoor wall niches facing ocean — 7 feet in width — SK — two large mirrors Table top in walkway/hall- JEE — needs bottom and glass for mirror — GK — 2/7/11? Sarah's Office Paint - before furniture arrives — Feb 5, 2011 desk lights — SK? Wired for computer — Scott GK — change all faceplates to white Master Suite Baseboard at entrance to MB painted white — completed 1/14/11 Sconces — 51.5 inches from floor - fill in holes on the side Mirror in Water Closet — space is 63 inches in width, 43 inches between sconce roughing, sconce roughing 28 inches above countertop Mirror in WC — marble surround — GK — running out of marble — JE — perhaps mirror — SK will investigate? Toilet "gun" Closets built — SK has the details Shower doors — still brainstorming Vanities in bath Outside Tub Mirrored back wall Area to be filled in with soil for planting Kitchen Fan — bottom level with bottom of pendants? kitchen tv — Nick Lambros TV brackets — Nick — must be centered over box — GK — fabrication in process? stereo — Nick Apple TV — Scott - requires TV have 1) HDMI input 2) Resolution 1080 p Existing Little Office - flooring GK — material will arrive week of 1/20/11 — 2/5/11 deadline dependent on labor to get it down Border to be measured — new border must be same width as existing wooden border Porch/Walkway outside Living Room JE - scaffolding/platform/sheeting apparatus kept area cool — brainstorm — canvas sail mounted on outside? — Brice — maintenance issues GK — transom — Ritz Carlton? — platform probably what blocked midday rays Brice — original screens — JE — may be hampered by sconces EFTA00582719