Zorro Ranch Projects / Tasks List PROJ. SORT ASSIGN. DATE & DESCRIPTION STATUS COMP. TO DATE JE 3/13 Zorro Ranch water status Memo 3/12/01 HM Advise Tamera that there needs to be water and food for Max at all times. Add details to house hold manual 3/15 complete 3/21 Quote to repaint garage doors in shop area 3/23 Will cost $875.00 will show GM JE when they arrive 3/30 2/28 Fix the crumbling column in the estancia Alice arranged for Les Files to come out in April — it needs to warm up. Adrian is re airin 3/28 3/29 complete 2/27 Give Jeff note book for JE walk throughs 3/15 complete 2/27 Frame the island pictures Pictures taken to Absolute Framing on 3/8 Expect completion 3/29 3/29 2/27 Have someone repair green fountain tiles Vernon tiles will come out in April to repair tiles. It needs to warm up Have Western Systems come out to install sound system when it arrives for Breakfast rm Sound system arrived 3/22 3/23 Western Systems will be out Friday 3/30 to install Has been installed but the remote is not working so Western Systems is trying to 3/28 complete SORT KEY JE- Mr. Epstein GM- Ms. Maxwell DI- Decorating Issues FC- Future Construction Issues HM- House Manual 1 EFTA00578182