ESTATE PROGRESS REPORT — September 26, 2003 71S1 STREET LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Jean Jean to be at 71° St Oct 2 at 2PM & spend remainder of day there. 51h Floor 1. GM study to be redecorated. GM would like a very simple white room — GM asked Jean to come up with a simple scheme. 2. JE wants 56 floor staff room to be repainted. Doug has been informed. 3. Lynn & Jojo are to move into the basement — JE to advise if 5'h floor is to become guest rooms, if it is to be decorated by Pinto & if the old carpets (bathroom etc) are to be used for that area? JE to see room & advise on return to NY. Pinto - Jean JE 6'h Floor Round table: is in the process of being restored. Expected completion by Oct 10. J Burdine 10/10 Bids / Contracts All contracts awarded. Ceiling Speakers Speakers to be installed in MBR & MBR Sitting Room. Doug has organized to have speaker wire installed. Doug Dining Room 1. Table-top: Brian Kelly is storing new rectangular table-top in his shop until after construction phase. 2. Lighting: JE approved two chandeliers instead of spotlights. 3. Carpet: JE approved green-striped carpet. Pinto - Jean Entry Hall 1. Entry hall door: door location to be changed. (Doug has been reminded of electric and security.) EFTA00577525