From: Warwick Wicksman < To: Doug Schoettle < CC:" , Tom Sze < , Bryan Oakes , Ken-Hao Hsu Subject: RE: LSJ scope of work Date: Fri, 18 Jun 2010 19:41:05 +0000 Attachments: LSJ BP 02 I00304.pdf Hi Doug, Thanks for the comments below. The team is working on the plan, and we have a few comments and questions. New Guest Pavilion: We really need a marked-up plan, showing where you think the new guest pavilion should be. (I attached the current plan for reference.) We were not sure from your description below. Please fax a sketch to Bryan's attention. Also, how large do you want the bedrooms, and what do you want in the bathrooms (separate shower and tub or combined, etc.). Pool Area: Want to confirm, the pool area is now to be sunken a few feet. Before you wanted to be the same level as the Main Residence, so one could walk straight across to it without going up or down steps. We will provide options for an open and covered pool area; any interest in an operable roof? Existing Residential Areas: Please confirm if the previously planned work at the Main Residence (extended kitchen area, revised roof and deck) is to remain per the previous design. Landscape: We will address this once the new planning is set. Proposal for Re-design: Doug and I discussed working on this re-design effort on a T+M basis, until we get the basic plan set and design concepts set, and are ready to re-engage our consultants and complete the construction documents. This is similar to our arrangement with Mr. Epstein at the very onset of this project (before the last version of the design). I would estimate that this effort would take about 3-4 weeks, and propose a not-to-exceed amount of 524,000 (plus reimbursable expenses). Please let me know if you are okay with this approach, and I will prepare an addendum to our original contract. Site Visit: We will visit the site as soon as we think we have incorporated all of the comments into a revised program/plan. I thin