01.01.00 Zone Ranch and Wireless Ethernet and Router Proposal Saco saw 9100 50.00 9103 $0.00 9100 9103 saw 0101.01 Eng,neenng and System Design Work 50.00 9100 Sa00 5000 9103 $0.00 9100 9103 24.0 53,000.00 0101.02 Pored hbngement 50.00 $000 $000 saw 100 52.50000 $aoo saw 9103 $0.00 01.01.01 Equipment Ordering and Inventory 4.0 5300.00 Sa00 $000 5000 9103 $0.00 MOO 9103 saw 0101.01 Staging for the Adtran 4430Router saw 9100 to $20000 saw 9103 $0.00 MOO 9103 saw 01.01.06 Starpng for the Radwin 2000C link 50.00 4.0 $340.00 9100 saw 9103 $0.00 MOO 9103 saw 0101.w Stapane for the Ruckus Wireless Equipment 50.00 4.0 $340.00 saw saw 9103 $0.00 MOO 9103 $0.00 01.02.00 Deploy to Lano Ranch and Install Radwin Link at the Equipment 01*(2 Installers and 1 Tech) $0.00 9100 9100 5000 9103 6.0 $0.00 1800 521900 9103 saw 01.02.01 Pull CatSe horn Pole to Frame Inside Fire Station 1.0 5150.00 9100 9100 saw SOW moo 9100 9103 saw 01.02.02 Install Indoor Frame at the Fire Station 4.0 5300.w $000 9100 5000 $003 $0.00 9100 9103 saw 0102.01 Install Pathan Radio and Pole Mount Hardware SO $450.00 $000 9100 saw saw $0.00 9100 9103 saw 01.02.01 Install Pole Ground Rod and cables 4.0 $300.0 9100 Sa00 saw saco $0.00 9100 9103 saw 01.02.0S Install Adtran LISvntth at Fire Station saw 2.0 $111100 9100 saw saw $0.00 9100 $003 saw 01.02.06 Install Ruckus Zone Director In the Fire Station vnth UPS saw 2.0 $110.W 9100 SOCO 9103 $uo 9100 $003 $0.00 01.02.07 Remove Adtran WAP and antennae from the fire Station Top LeVel 4.0 $300.00 4.0 $340.w 9100 SOX° 9103 woo saw 9103 $0.00 0102.08 Run outdoor CatSe far Ruckus API& 4P2 back to the Wall Mount Swing out Frame 4.0 $300.00 4.0 $340.120 9100 saw SOW woo 9100 9103 saw 01.03.00 Deploy to taro Ranch to Install Radwin Link at the HVAC ( 2 Installer and 1 Ted.) SO