GROFF JOB Actual Cost As of 5-20-14 Description appliances $ 22,949.54 blueprints $ 124.08 brick cabinetry and countertops $ 90,667.63 carpeting in bedrooms chimneys-2 $ 2,538.89 clean up $ 2,900.00 closet shelving $ 9,574.39 columns - pergula basement $ 25,504.76 demolition $ 21,500.00 doors interior $ 11,800.00 dumpsters $ 10,254.42 elevator electric $ 93,497.00 engineering $ 6,736.12 excavation $ 81,646.98 Excavation - Drywells $ 16,877.08 driveway $ 2,653.43 fireplace fronts $ 10,869.45 flashing flatwork $ 37,391.17 foundation $ 58,601.84 framing labor $ 97,650.00 framing lumber $ 125,923.72 front door $ 8,327.11 garage doors $ 19,003.45 granite kitchen and powder room floor gutters $ 8,056.83 hardwood flooring $ 33,024.83 house warranty hvac $ 47,200.30 insulation $ 16,045.00 labor $ 2,450.00 land clearing (in excavation) landscaping $ 1,062.00 lighting fixtures $ 7,299.72 locks $ 5,559.19 marble in master bath $ 5,075.82 mirrors/ shower doors $ 11,811.45 paint interior and exterior $ 100,455.56 permits plumbing fixtures $ 15,028.70 plumbing labor $ 36,100.00 rail exterior $ 11,475.00 punch list $ 3,294.97 portable toilet $ 3,054.77 EFTA00289471